$0 New York — Home Daycare Licensing Checklist

How to Open a Daycare in NY

Most people who want to open a home daycare in New York already have a clear picture of the daily routine — circle time, snack prep, nap schedules. What blindsides them is the administrative pipeline. New York requires a formal registration (for Family Day Care) or license (for Group Family Day Care) through the Office of Children and Family Services (OCFS), and the process from orientation to approval typically runs 90 to 180 days. Skipping it isn't an option: operating without valid credentials exposes you to cease-and-desist orders and fines up to $2,000 per violation. A two-year ban on future licensing applies in specified circumstances, including being fined on separate occasions for operating an unlicensed daycare or surrendering an active license to avoid formal enforcement action.

Here's how the process actually works, broken into the phases you'll move through.

Decide Which License Type You Need

New York regulates home-based child care under two categories, both governed by OCFS:

  • Family Day Care (FDC) — 18 NYCRR Part 417. One provider, 3 to 6 children (up to 8 if at least 2 are school-age). No assistant is required for the standard capacity; more than 2 children under two requires an additional approved caregiver to maintain the 1:2 ratio. Your own children under school age count toward the cap.
  • Group Family Day Care (GFDC) — 18 NYCRR Part 416. One provider, with an approved assistant required when more than 6 children (or more than 8 when at least 2 are school-age) are in attendance; capacity is 7 to 12 children, up to 16 if at least 4 are school-age. A single caregiver may operate independently only when there are 8 or fewer children, no more than 2 are under two, and at least 2 are school-age. Requires a license rather than a registration.

The FDC path has lower overhead and typically no assistant payroll, which makes it the natural starting point for parent-operators. If you already have two children under five, though, your marketable slots drop to four — run those numbers before committing.

Complete the OCFS Online Orientation

Before OCFS will send you an application package, you must complete the free online Child Day Care Orientation. It takes roughly 1.5 hours and covers the legal responsibilities, financial realities, and safety expectations of running a regulated program. At the end you receive a certificate, which triggers the next step: OCFS emails you a unique link to access the Facility Application and Management System (FAMS), where the rest of the process lives.

Clear Background Checks for Everyone in the Home

This is where timelines get unpredictable. New York requires Comprehensive Background Checks (CBCs) for the applicant, any assistants or substitutes, and every household member aged 18 or older — not just people who interact with the children.

The screening layers include:

  • Statewide Central Register (SCR) check for child abuse or maltreatment history (form LDSS-3370, requires a 28-year address history)
  • Staff Exclusion List (SEL) check via form OCFS-6022
  • DCJS and FBI fingerprinting at an authorized IdentoGO location, costing $75 to $100 per person

Clean records typically clear in 7 to 10 business days. Out-of-state history or prior arrests can stretch resolution to 4 to 8 weeks. Start fingerprinting as early as possible — it's the single biggest bottleneck in the timeline.

Free Download

Get the New York — Home Daycare Licensing Checklist

Everything in this article as a printable checklist — plus action plans and reference guides you can start using today.

Complete Pre-Service Training

Before OCFS will approve your registration or license, you need:

  1. 15-hour health and safety course — an OCFS-approved in-person class covering child development, safe sleep practices, abuse identification, and program management. You can apply for a state training rebate of up to $235 to offset the cost.
  2. Pediatric CPR and first aid certification — must be current, in-person (not online-only), and matched to the ages of children you'll serve.
  3. Foundations in Health and Safety — a free 5-hour online course required for you, all assistants, and any volunteers within three months of starting.

These training hours aren't wasted time. The 15-hour course covers operational scenarios — medication administration protocols, emergency evacuation drills, nutrition planning — that directly shape how inspectors evaluate your program.

Prepare Your Home for Inspection

OCFS will send an inspector to your home before issuing any credentials. The inspection covers the entire residence and grounds. Key standards include:

  • At least 35 square feet of usable indoor space per child (excluding hallways, bathrooms, kitchens, and storage)
  • Two remote exits positioned far enough apart to prevent trapping during an emergency
  • Working smoke detectors and carbon monoxide detectors on every level
  • Fire extinguishers (Class ABC) mounted in accessible, visible locations
  • Emergency numbers (911 and Poison Control) posted next to the phone
  • Heating system capable of maintaining at least 68°F in program areas

If your home has a private well, you'll need a water quality report from a state-licensed lab dated within 12 months of your application. Homes in EPA Zone 1 radon counties must also pass a radon test (anything above 4.0 pCi/L requires mitigation before approval).

Submit Through FAMS and Wait for the Inspection

The full application — clearances, training certificates, medical statements, floor plan sketch, evacuation diagram, and behavior management policy — goes through FAMS. You have 90 days from receiving your application package to submit everything; miss that window and OCFS may terminate your application.

Once paperwork is approved, an OCFS representative (or ACS registrar in New York City) schedules the pre-opening home inspection. If violations come up, you'll get a Corrective Action Plan with a timeline to fix them. After corrections clear, you receive an initial registration (FDC) or license (GFDC) valid for two years; renewals after that run four-year terms.

What Happens If You're Renting

New York provides strong statutory protections for home-based providers in rental housing. Under Social Services Law § 390(12)(a), municipalities and landlords cannot use zoning ordinances or lease clauses to prohibit a properly registered FDC or licensed GFDC in a residential dwelling. Courts have consistently upheld this — in 65 Ocean Ave. Assoc. v. Samuel, the court ruled that operating a state-registered daycare does not violate a standard "residential use only" lease clause.

That said, open communication with your landlord is still smart practice. A professional written notification explaining your legal protections, liability insurance coverage, and operational hours prevents friction before it starts.

The Practical Timeline

Working backward from a typical 90-day window:

  • Days 1–7: Complete OCFS orientation, set up My.NY.gov account, receive FAMS access
  • Days 7–14: Schedule IdentoGO fingerprinting for all household members 18+
  • Days 14–30: Submit CBC packets through FAMS, enroll in 15-hour training course
  • Days 30–45: Complete training, obtain CPR/first aid certification, gather medical statements
  • Days 45–60: Prepare home — safety equipment, egress routes, floor plan sketch
  • Days 60–75: Submit completed application through FAMS
  • Days 75–90+: Pre-opening inspection, corrective action (if needed), approval

Delays almost always come from background checks (especially with out-of-state addresses) or incomplete paperwork. Front-loading the fingerprinting and having a complete address history ready before you start cuts weeks off the process.

The New York Home Daycare Licensing Guide walks through each of these phases with fillable trackers, a room-by-room pre-inspection checklist, and a 90-day timeline planner — designed to keep the administrative side moving while you focus on building the program.

Get Your Free New York — Home Daycare Licensing Checklist

Download the New York — Home Daycare Licensing Checklist — a printable guide with checklists, scripts, and action plans you can start using today.

Learn More →